Cruisers Forum
 


Reply
  This discussion is proudly sponsored by:
Please support our sponsors and let them know you heard about their products on Cruisers Forums. Advertise Here
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 01-11-2020, 03:59   #1
Registered User

Join Date: Oct 2017
Location: Estonia
Boat: sailing Shipman 28 / OE36 project
Posts: 96
Anchor chain deck pipe question

Hello

I have an idea to build a waterproof compartment in the bow of my Shipman 28 for anchor chain. Asking for some thoughts, advice.

Current situation is:

-Anchor is stored in the bow, chain not attached. (I have a stern anchor handy for emergency situations or short breaks).

-Chain / rode combo is neatly stored in a special 2-compartment bucket (chain in the middle compartment and rode coiled around it) in cocpit locker.

To use the anchor I drag the bucket to the bow, attach the chain and lower the anchor. I don't have windlass as I don't see the need for it in the boat this size.

Why I want to change it?
A. I want to increase the chain part of the ground tackle, maybe even use all length chain. The bucket would become too heavy to drag around.
B. Cocpit locker space can be used better while there is no use for the bow locker at the moment.

Building the waterproof compartment would be quite straightforward, some glass mat / cloth and poly resin. Compartment can be accessed via watertight hatch from bow cabin. Drains out both sides.

What bothers me is the "deck pipe" or "navel pipe" to lead chain through the deck. They tend to leak as we know and Shipman 28 is not very dry riding boat in waves. There are different solutions, all somewhat glumsy or just not neat (i.e. modeling clay, tennis balls over the chain etc...)

Why not use a deck filler screw cap (like fuel filler cap) as a deck pipe? Like this: https://www.svb24.com/en/deck-filler...me-plated.html
Attach a small hook to the cap to hang the chain. To prepare anchoring one would unscrew the cap, pull out the end of chain and attach it to the anchor. The chain for Shipman 28 would be 8mm, like this https://www.osculati.com/en/11004-01...70-8-mm-x-50-m
It should feed through fuel cap type pipe OK, I hope (opening ca 30mm vs chain link 26mm). Or maybe not?

This proccess of anchoring like this does sound slow but it would definately be no slower than dragging the bucket from stern to bow and then start attching the chain.

Am I over thinking? Maybe go for standard lid type navel pipe and stuff some rags into the opening to waterproof?

Some photos of current setup:

Kobra 12kg anchor in the bow:
Click image for larger version

Name:	IMG_0244.jpg
Views:	387
Size:	442.3 KB
ID:	226237

Orange chain/rode bucket in the bow:
Click image for larger version

Name:	Copy of IMG_20190615_173952.jpg
Views:	233
Size:	401.2 KB
ID:	226238

Stern anchor 7.5kg Bruce with ankarolina webbing + some meters chain:
Click image for larger version

Name:	IMG_0440.jpg
Views:	216
Size:	428.4 KB
ID:	226239
mait is offline   Reply With Quote
Old 01-11-2020, 05:17   #2
Moderator
 
tkeithlu's Avatar

Cruisers Forum Supporter

Join Date: Feb 2012
Location: Carrabelle, Florida
Boat: Fiberglas shattering 44' steel trawler
Posts: 6,084
Re: Anchor chain deck pipe question

You've thought it through quite well. One point. If you indeed have drains at the sides/lowest points of the compartment, it doesn't matter that small amounts of water get in. You could even intentionally flush the chain with a garden hose while it is in the compartment. Go for it.
__________________
Never let anything mechanical know that you are in a hurry.
tkeithlu is offline   Reply With Quote
Old 01-11-2020, 05:45   #3
Registered User
 
SV Siren's Avatar

Join Date: Oct 2012
Location: Allegan, Mi
Boat: 1968 Columbia 50
Posts: 615
Re: Anchor chain deck pipe question

What you're describing is a Hawse pipe with a lid, and yes they do tend to leak when taking a lot of water over the bow. Usually I stuff toilet ring seal material into and around the chain once things are secured. Cheap and readily available everywhere. In adding or creating a chain locker, I would, and do have, drainage at the lowest part of the compartment, to allow water to drain from the locker into the bilge where it can be pumped overboard.

Some hawse pipes with lids are spring loaded to keep the lid closed, which I like.
https://www.defender.com/product3.js...6133&id=33074#

I found this guys approach to be quite interesting, and it seemed to work for him quite well:
https://www.pbo.co.uk/practical-proj...ipe-bung-21159

And another article:
https://www.practical-sailor.com/blo...t-chain-pipe-2
__________________
Fair winds from the crew of the S/V Siren.
SV Siren is offline   Reply With Quote
Old 01-11-2020, 06:39   #4
Registered User
 
Orion Jim's Avatar

Join Date: Dec 2008
Location: Noank, Ct. USA
Boat: Cape Dory 31
Posts: 3,174
Images: 8
Re: Anchor chain deck pipe question

What is commonly referred to as a chain pipe is actually a spurling pipe. The example cited in a previous response is not spring loaded, it has a short length of chain to keep the cap from being lost overboard easily.
Since you have a stern anchor easily deployed from the stern in an emergency separating your chain from your primary anchor at the bow (still known as a “bower” while your stern anchor would be known as a “kedge”) makes some sense but you are taking a risk. A short length of self amalgamating rigging tape can be used to seal off the chain pipe and can be removed in a moment. This way you are not trying to attach your chain to your anchor when conditions are less than ideal and the safety of the vessel and lives depend upon expedient deployment of your anchor.

https://www.defender.com/product.jsp?id=3058170
Orion Jim is offline   Reply With Quote
Old 01-11-2020, 06:54   #5
Moderator

Join Date: Jun 2015
Posts: 6,219
Re: Anchor chain deck pipe question

Mait:

Quote: "Am I over thinking? "

Yes, you are :-)!

If I'm not mistaken the Shipman already has a water tight compartment way, WAY up front, as does TrentePieds. If that compartment isn't sealed off from the rest of the boat, it's easy to make it so. So let me tell you how TP works:

TP's displacement is five tons, yours is three tones. TP has a 33 pound (15Kg) Bruce anchor on 40 feet (call it 7 fathoms) of 5/16" (9 millimetre) chain spliced to 300 feet (50 fathoms) of 1/2" (12 mm) three strand nylon rode. I use fathoms because spurious accuracy just gets in your way for these sorts of things :-) The anchor stows in chocks on the stem head just like yours does, and is held into the chocks by means of a “devils claw” - a chain hook on a length of line which belays on a cleat on deck.

TP has an electric capstan with a chain gypsy. Pain in the butt, since, as is so often the case with "yacht gear", "pretty" trumped "useful" at the design stage. The capstan obviously has a "spurling pipe". A "spurling" is merely a short "navel" to take the rode from the deck down into the chain locker where it self-stows. 'Cept rope in these tiny dimensions doesn't have the weight to self-stow. Some things don't scale!! Capstans are one of them :-)

So: Coming to my anchoring berth I already know the scope required in the circumstances, having worked that out in advance. So if I need, say, five and twenty fathoms I bid the capstan good day and haul out, through the spurling while ignoring the capstan, five and twenty fathoms by hand. I measure the rode twixt my outstretched hands as sailors have done since man first went to sea. The term “fathom” denotes, as you probably know, but which we “moderns” tend to forget, the distance twixt a man's outstretched hands. I let the rode lie on deck till we are over the anchor position, then stop and lower the anchor hand over hand. When I feel bottom, we back down slowly while I pay out more rode keeping it slack till we have a scope of three or thereabouts, then I snub the rode to make the anchor “take a bite”. When I can feel that that has happened, we back down till all required scope is out. Then we increase power to ensure that the hook is well and truly set.

Departing, we come forward slowly while I bring in the rode hand over hand and let it flake down on deck. Toy capstans are IMO useless for taking in rode. When we are “up'n'down”, if the anchor doesn't feel free to may hands, I belay the rode and we apply some power to “wiggle out” the anchor. When the hook is up and in the chocks, I clap on the devil's claw. We still have the rode lying on deck. The gypsy handles the chain, alright, and the chain is obviously self-stowing. The splice is a pain because the spurling is such a dainty little thing - “pretty” having overridden “useful” in the designer's mind - so I help it through the spurling by hand. Thereafter the rope rode will usually follow courtesy of the little doodad that forces the rope into the gypsy so that, completely contrary to received wisdom, the rope actually gets PUSHED through the spurling.

The locker, an inverted pyramid, has a drain hole at the apex so that water and muck can escape. Provided you take reasonable care with cleaning the rode as it comes in, muck in the chain locker is never a problem. Because I leave the rode on deck rather than stow it directly it comes aboard, a bucket of seawater heaved onto it does the job of cleaning quite admirably.

As I said: “Some things don't scale”. Trying to emulate procedures for grown-up ships, doesn't really work in a five-tonner, let alone in a three-tonner like yours. Best to develop procedures that are “boat specific” having regard to the gear you have to work with. I'm pretty confident that in a Shipman 28 you can, sans capstan, set up to do the job, including stowing the rode, in a very similar way to what we are doing in TP. However, using a spurling pipe (or a navel) may not be the best idea if you don't have a capstan 'cos you can't push a rope :-)! On this coast many of the smaller boats have a “chain locker” below a hatch on deck. If the hatch is, say, 15 x 15 inches (say 40 x 40 cm.) then you can drop the rope rode directly into the locker rather than go through the intermediate step of flaking it on deck when you first bring it in.

Cheers

TrentePieds
TrentePieds is online now   Reply With Quote
Old 01-11-2020, 09:01   #6
Registered User

Join Date: Feb 2015
Boat: Land bound, previously Morgan 462
Posts: 1,991
Re: Anchor chain deck pipe question

Good idea to have the drain overboard, not to the bilge as you mentioned. Keep water muddy or smelly with algea and other little critters out of bilge. Be aware that after a few years you may find some staining on the hull below those drains especially if your chain or shackles have any rust spots.

Now with spurling pipe, you need a certain vertical drop to contain the rode, otherwise it will stack up in a pile and limit how much you can store there. Test it. It won't coil or spread as well as it does with an open bucket that you used in the past.

As you mentioned, you will need access to that compartment from inside the boat, via an opening door that seals well against water. Problem being that you may need to open it more often than you might like, so make the opening with care and use hinges and latch with westher seal, not just a number of screws and sealant to secure it.

Rather than the spurling pipe, a small hatch in the deck above the externally drained compartment would be ideal, as many newer boats have built in, but that is a job requiring more expertise, certainly than I have.
__________________
No shirt, no shoes, no problem!
waterman46 is offline   Reply With Quote
Old 01-11-2020, 09:44   #7
Moderator

Join Date: Jun 2015
Posts: 6,219
Re: Anchor chain deck pipe question

Quote: "As you mentioned, you will need access to that compartment from inside the boat, via an opening door that seals well against water. "

Yes, absolutely. I have an access hatch twixt the chain locker and the fore cabin. The rode never brings enuff water through the spurling that any comes through that hatch, but if you are anticipating hosing down the rode while it's in the locker, then obviously you need to have a water tight hatch.

A couple of times I've had to send someone below to PULL the rode through the inadequate the windlass is fitted with. Thus, the access hath is essential.

A further point we didn't mention is the need to put a stopper (a simple "figure 8" knot will do) in the inboard end of the rode so it cannot run through the spurling. It's just too embarrassing to have the whole lot go overboard because you weren't paying attention :-)

TP
TrentePieds is online now   Reply With Quote
Old 01-11-2020, 10:03   #8
Registered User
 
Cheechako's Avatar

Join Date: Aug 2006
Location: Skagit City, WA
Posts: 25,524
Re: Anchor chain deck pipe question

I think you are over thinking it. A good chain pipe has an opening so the rode can exit it and is ready to deploy. Without it ready to use you are causing more risk than a bit of water getting below in heavy weather.
Build a chain compartment that drains to the bilge, or put a bottom in it above the Waterline and have small drains either side right at the bow above the waterline like many boats have.
If going all chain, consider a windlass that has it's own deck pipe.
Attached Thumbnails
Click image for larger version

Name:	chaindrain.jpg
Views:	93
Size:	120.8 KB
ID:	226258  
__________________
"I spent most of my money on Booze, Broads and Boats. The rest I wasted" - Elmore Leonard











Cheechako is offline   Reply With Quote
Old 01-11-2020, 13:05   #9
Registered User

Join Date: Sep 2017
Location: Langley, WA
Boat: Nordic 44
Posts: 2,509
Re: Anchor chain deck pipe question

mait, I have exactly what you are thinking about but on a much larger boat.

In my setup the chain locker drains into a separate sump with it's own automatic bilge pump.

If you put a shelf in your locker with drains overboard you have to consider the heeled height of the shelf. If the drain hole is below the heeled water line it becomes a fill hole.

Also consider the affect of the weight of of all of the ground tackle. In my case there is 300 ft of chain, two anchors and a windlass. If does affect trim. I know yours will be considerably less but so is the weight of your boat.
stormalong is offline   Reply With Quote
Old 01-11-2020, 13:32   #10
Registered User
 
Cadence's Avatar

Join Date: Dec 2008
Location: SC
Boat: None,build the one shown of glass, had many from 6' to 48'.
Posts: 10,208
Re: Anchor chain deck pipe question

Orion Jim made a valid point. Having to attach your anchor is not sensible.
Cadence is offline   Reply With Quote
Old 24-11-2020, 22:46   #11
Registered User

Join Date: Oct 2017
Location: Estonia
Boat: sailing Shipman 28 / OE36 project
Posts: 96
Re: Anchor chain deck pipe question

Thanks a lot to everybody who answered. Given it a second thought it doesn't really make sense to detach anchor from chain.
Probably I will go with one of these, leave the chain attached and drain the locker overboard.

Name:   27A04705-E940-4A24-AD30-B09343D626F6_4_5005_c.jpeg
Views: 719
Size:  16.1 KB
https://www.defender.com/product.jsp?id=33090

I am planning to go with 60m (200ft) of 8mm (5/16) chain stored in anchor locker. And additional 30m (or more) of rope to be attached if needed. I am afraid I can not force the rope to go down through the locker opening so it has to be detached from chain.

Of course for a 3ton boat the chain weight is noticable in the bow but there are not many choices. 6mm (1/4) HT chain is difficult to get and would need larger end links etc...
mait is offline   Reply With Quote
Reply

Tags
anchor, deck


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
PVC pipe for diesel fill pipe Cestmoi Engines and Propulsion Systems 4 12-05-2020 12:02
Stop my anchor chain hawse pipe from leaking jr_spyder Deck hardware: Rigging, Sails & Hoisting 22 01-01-2020 11:56
Deck anchor pipe Target9000 Construction, Maintenance & Refit 1 13-03-2013 12:23
For Sale: Large SS hinged anchor deck pipe over40pirate Classifieds Archive 2 24-09-2012 11:00
Chain Twist Clogging Hawse Pipe Paolo Anchoring & Mooring 23 06-07-2009 07:18

Advertise Here


All times are GMT -7. The time now is 09:06.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.