Old 02-08-2014, 16:11   #1
Registered User
 
jordiebsocal's Avatar

Join Date: Mar 2013
Location: Marina del Rey, CA
Boat: '46 Creekmore
Posts: 27
Talking Interconnecting/Bus Bar Battery Cable Lengths - Some Closure

Hi All!

I am pretty confident in the set up that I have going right now. I am just looking for a bit of confirmation by the pro's. I have (8) Trojan L16H-AC batteries. There are two banks that each are comprised of four batteries. Two in series to make 12v and then two strings of two in parallel for a nominal 12v 870Ahr @ a C20 discharge.

After much due diligence, I understand that the wires that are doing the series connections should be the same length and gauge, and that the wires that are paralleling the two strings together are to be the same length and gauge. The Hot and Ground runs that will come from opposite diagonals of the respective bank will also be the same length from the terminal post to the respective Bus Bar ( + or - ).

This said, it is not required that ALL interconnecting cables be the same length and gauge. Albeit, ALL of the series cables should be the same L&G and ALL of the paralleling cables be the same L&G.

In essence, this is to achieve an equal length of cable between the batteries connections and the runs to their respective bus bars.

PIC 1

Click image for larger version

Name:	Sketch2614223.png
Views:	457
Size:	263.4 KB
ID:	86004

Purple Bank is Bank 1
Orange Bank is Bank 2
All Paralleling cables (green) are same length and gauge (16.5" x 1/0 AWG)
All Series cables (yellow) are same length and gauge ( 5" x 1/0 AWG)
The cables that will connect to the (+)Bus and (-)Bus for each bank (blue) will also be of equal length. Said another way, bank 1's "blue" cables (+&-) will be the same length to the common Bus bars, Likewise for Orange, but Oranges will be shorter since the common Bus bars are located at the bottom of the drawing in reference to the two banks.


PIC 2

Click image for larger version

Name:	Sketch26155423.png
Views:	547
Size:	164.4 KB
ID:	86009

Both banks are fuse protected at the (+) terminal with a BSS Terminal fuse block (PN 5191) and a 250A fuse (PN 5189). I have the system fused as such since we do have a 3000w inverter and want the ability to crank the engine from the house Bank/Banks.

I have the two banks wired to the same Bus bar for charging with Blue sea's switches (PN 9006) to isolate which one is charging and which is being used for house loads. There will be a second Hot lead from each bank that will run to a 1/2/BOTH switch. This switch will determine which Bank (or both) will power house loads and crank the battery in the event that the dedicated starter bank fails.

PIC 3

Click image for larger version

Name:	20140802_155944.jpg
Views:	610
Size:	340.4 KB
ID:	86010

The hot lead from each battery bank (labeled A&B in this pic) will terminate in a 1/2/BOTH switch that will determine which bank/Banks will supply house/cranking loads. From the House Selector switch, one cable will go to the house distribution panel, the other will go to a second 1/2/BOTH switch that will determine where the cranking load will come from.
( I plan to have it on the cranking battery unless there is a cranking battery failure).

That pretty much all!

Thank you all in advance for your input and constructive criticism!
jordiebsocal is offline   Reply With Quote
 

Tags
battery


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
East River Closure for UN Meeting 2013 mmr Rules of the Road, Regulations & Red Tape 14 24-09-2013 03:53
CAN Bus Cable & Connector Source rabend Marine Electronics 1 17-05-2012 05:36
Cable Size for AC Grounding Bus to DC Neg Main Bus ? Beausoleil Electrical: Batteries, Generators & Solar 1 26-10-2010 11:19
Canal Closure - France Grehan Europe & Mediterranean 0 19-04-2010 02:13
Waterway Closure Near Chicago - Affects Great Lakes Boats Transiting South to Gulf! teneicm Cruising News & Events 2 10-09-2009 11:49

Advertise Here


All times are GMT -7. The time now is 19:18.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.