Squeaked under..but be aware ..no more than 3mins after passing under we turned around the lift bridge was down and the train whistle gave warning and 30 secs latter the train passed over..though there is a red flashing light of prior warning..we didnt see it..
..another piece of warning was missing as well.. there was suppose to be a flag man on the bridge preceding the train checking for boat traffic before lowering the bridge..none was seen..
Interesting,I was there by car in April 2019 to check the bridge height, a northbound train (sugar company) approached, it stopped just before the road,the engineer got down and walked over to a control box and set the bridge in motion,after they passed over,the bridge rose without help !