14 month update. The
boat has come along nicely. Preventive
maintenance done:
new
batteries
traced down, checked and labeled and cleaned up most of the
wiring on the
boat
all new
fuel and
coolant system hoses, belts, impeller
cleaned
fuel tank
new
racor fuel filter
replumbed fresh
water system with pex
new macerator
pump, fresh
water pump,
water heater and rebuilt Whale gushers
new LED
lighting inside and out
new
grill and
galley stove
new
dock lines, anchors, chain and
rode.
temporary
air conditioning
rebuilt
head
new
head and
galley faucets
new smoke and CO alarms
rebedded several fittings
retorqued
keel nuts
replumbed fresh/black water vents. New fresh water fill hoses.
New
deck cap O rings
new
propane locker and lines
This fall: step the
mast. New running
rigging. Standing
rigging inspection.
Winch sevice.
Spring/summer: all new
electronics and
solar. Bottom job.
Retire June '23. Set sail Oct '23.
So far, so good. No real surprises. I've enjoyed the
work and getting to know the boat.