He he, first job for 2011 was to go down to the
boat and chisel out all the rainwater that leaked into the
bilge and froze. We had a two day thaw so I waited til Jan 01. The ice block was floating with half an inch of
water all around. Damn that is cold to
lift out without gloves on. But it got done, the
leaks in the tarp are patched and hopefully we won't have much more.
Iceboating? that would be such a rush!
Happy New Year everyone.
Sabre