Construction is finally done and we hoisted it over with the main
halyard yesterday. It sure is a beast and tall but we wanted to be able to walk under it. The true test will be when it's put to the test after install and knocking around the coast.
Backing plates are 6" x 12" and will have G10 tubing installed in the fiberglass/balsa
deck to act as
compression fittings.
We constructed it of 304 stainless 2" pipe. Considered having it powder coated but opted with awlgrip and it was painted by RW Little in
San Diego for $670 (delivery included). We have unwrapped it and I'll post a pic after it's bolted to the
deck and the
solar panels are installed.