I’ve heard this rumour that the big 3 design their rigs to fail before capsize, but I can’t imagine the engineering required to actually
work out what value to use. Rig loads vary so much with
wind and wave action that I can’t imagine that you could create a ‘fuse’ that wouldn’t have a good chance of letting go prematurely.