Quote:
Originally Posted by ausnp84
All depends on what needs doing and what level of finish you’re aiming for! If it’s a full gut and refit with top quality cabinetry and fittings then yep, a solid 12-18 months with multiple people working on it sounds correct.
If it’s a case of removing a bit of crap, finishing some woodwork and tweaking systems, 12 months on your own is easily achievable.
N
|
I think he was referring specifically to the
Catana 48. While the
boat has already been gutted for the most part, based on the photos of the framing under the
galley, I'd assume the whole bridgedeck floor needs to be pulled and redone. The ceiling and overhead were covered in vinyl and either need to be replaced or faired to get that surface paintable- a ton of back breaking work!
12-18 months of full time
work would might get this cruiseable. Crazy amount of
work needed, but I'm jealous of whoever gets the opportunity to give it a shot.
Matt