KLAUS
YOU STATED THAT YOUR
LITHIUM BATTERY BANK IS ONLY 400aH. ANY
ALTERNATOR PUTTING OUT MORE THAN 160 AMPS WILL ULTIMATELY DAMAGE THEM AS THEY LIKE TO BE CHARGED AT LOWER AMPERAGE THAN YOU WOULD SPEC OUT FOR ANY FORM OF LEAD ACID.
LITHIUM DOES NOT NEED "DEEP"
CHARGING.
I HAVE 7 x 120 aH (840 aH)
LiFePO4 AS MY
SERVICE BANK. I PURCHASED A 200 AMP
ALTERNATOR FROM POWERMAX IN THE US THAT WAS MADE TO RETRO-FIT (DIRECT REPLACEMENT) FOR THE HITACHI ALTERNATOR ON MY
YANMAR 4JH3-HTE
ENGINE. IT IS
SINGLE PULLEY AND PRODUCES FULL OUTPUT AT 1500
RPM.
SO IN ORDER NOT TO COOK THE ALTERNATOR OR THE
BATTERIES, I HAD A SLIGHTLY LARGER
SINGLE BELT PULLEY INSTALLED TO REPLACE THE ORIGINAL PULLEY IN ORDER TO REDUCE THE TOTAL AMPERAGE OUTPUT. I ESTIMATE I AM PUTTING OUT 180 AMPS. IT IS STILL A BIT MUCH FOR THE
SERVICE BANK, BUT I WANTED A BIT EXTRA OUTPUT FOR WHEN THE BOW THRUSTER IS IN USE AS IT DRAWS 500 AMPS.
I RECENTLY MOTORED FROM PESCARA,
ITALY TO BAR, MONTENEGRO RUNNING MY
ENGINE FOR 2500 RPM FOR 27 HOURS. UNFORTUNATELY, THERE WAS VERY LITTLE
WIND TO SAIL.
BOTH THE
BATTERIES AND THE ALTERNATOR WERE ONLY WARM TO THE TOUCH. THE ALTERNATOR PUTS OUT 14.8 VOLTS. A LITTLE TOO HIGH FOR THE LFP. THEY SHOULD ONLY GET ABOUT 14.2 TO A MAX OF 14.6. LOWER VOLTAGE IS BETTER. THEY CHARGE NICELY TO 13.8 VOLTS.
MANY TIMES I WILL TURN THE
CHARGING OFF FOR THE BATTERIES FOR ANYWHERE FROM 2 - 4 DAYS.
I HAVE ON THREE SEPARATE OCCASIONS DEPLETED THE
BATTERY BANK DOWN TO 9.5 VOLTS. WITH AN 60 AMP SHORE POWERED BATTERY
CHARGER, THE ENTIRE SERVICE BANK REACHED FULL CHARGE IN 4.5 HRS. UNDER NORMAL USE SUPPLEMENTED WITH
SOLAR CHARGING (600 WATTS), THE BATTERIES SHOULD REMAIN NEAR PEAK CHARGE ON A DAILY BASIS.
THE
SOLAR PANELS WILL BE INSTALLED IN ANOTHER MONTH AND A HALF.
THERE IS AN EXTERNAL BMS UNIT FOR THE SERVICE BANK. THE ALTERNATOR COSTS $200.
IN MY OPINION, YOU ARE SPENDING TOO MUCH
MONEY FOR ALTERNATORS AND CONTROLLERS.
BALMAR IS WAY TO EXPENSIVE AND TOO MUCH
WORK TO ADAPT AND INSTALL.
IT IS MY DESIRE AND INTENTION TO KEEP THE SYSTEM AS SIMPLE AND
MAINTENANCE FREE AS POSSIBLE.
I HAVE ONE OTHER OPINION TO EXPRESS. GET RID OF ALL THOSE GENERATORS. THE TOTAL EXPENSES ASSOCIATED WITH THE ACQUISITION COST OF THE GENSET, THE
INSTALLATION,
MAINTENANCE, ADDITIONAL PROBLEMS OF INADEQUATE PERFORMANCE, NO OUTPUT, ETC. OR ABILITY TO TROUBLE SHOOT PROBLEMS ARE ENORMOUS. AND OF COURSE TRYING TO GET SKILLED TECHNICAL HELP AND
PARTS IN FAR OFF LOCATIONS.
THEN THERE IS THE ADDITIONAL WEIGHT
NOISE,
FUEL CONSUMPTION, NEED FOR EXTRA
FUEL OR MORE RAPID DEPLETION OF FUEL TAKEN FROM THAT WHICH COULD BE USED FOR THE AUXILIARY DRIVE ENGINE.
I WOULD RECOMMEND A LARGER SERVICE BANK OF
LiFePO4 BATTERIES. TO REPLACE GENSETS. IF THERE IS NOT ENOUGH
SOLAR CHARGING AVAILABLE, SHORT RUNS OF THE ENGINE ARE ALL THAT ARE NECESSARY TO CHARGE THEM UP.
FOR THOSE THAT WANT TO RUN
AIR CONDITIONING OR
ELECTRIC HEAT, JUST SIZE THE LiFePO4 ACCORDINGLY AND GET AN APPROPRIATE
INVERTER.
ONCE MY AC/HEAT (2 UNITS -- 16K BTU/2KW HEAT + 9K BTU/1.7KW HEAT) ARRIVES AND IS INSTALLED ALONG WITH THE
SOLAR PANELS, I WILL START A THREAD TO OUTLINE THE PERFORMANCE OF THE SYSTEM I HAVE DESIGNED FOR MY 2004
BENETEAU 50.
GOOD LUCK ALL AND HAVE A WONDERFUL NEW YEAR
CAPTAIN RON
CURRENT INSTALL W-SLA 1.JPG
Views: 268
Size: 117.3 KB
ID: 115976" style="margin: 2px" />