a) Does anyone have 1) experience, 2) comments; about pulling say 4m of Polyester outer
core over the outer (and inner)
core of 8mm Double Braid (DB)
rope (with ends whipped/stitched and the whole length massaged into place?
(I have an 8mm DB topping
lift. - the 8 is perfect for most of the length but I'd prefer 10mm through the
rope clutch,
winch and for me to handle. I have in-boom
furling so my boom is pretty heavy).
b) Any suggested uses for the excess 4m of inner core?
Cheers,
Andrew G