Cruisers Forum
 

Go Back   Cruisers & Sailing Forums > Engineering & Systems > Construction, Maintenance & Refit
Cruiser Wiki Click Here to Login
Register Vendors FAQ Community Calendar Today's Posts Log in

Reply
  This discussion is proudly sponsored by:
Please support our sponsors and let them know you heard about their products on Cruisers Forums. Advertise Here
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 07-11-2010, 09:23   #1
Registered User
 
CharlieCobra's Avatar

Cruisers Forum Supporter

Join Date: Jun 2006
Location: PNW
Boat: Knutson K-35 Yawl "Oh Joy" - Mariner 31 Ketch "Kahagon" - K-40 "Seasmoke" - 30' Sloop "Baccus"
Posts: 1,289
The Restoration of 'Lady J' - Week 14 - I Think . . .

Just a quick update. We've started scarphing in mast sections prior to assembly. Here we are matching the curves.



Now we're checking the joint lines.



A ton of work to get dissimilar pieces to match up before we make the round-over cut. We have three spray coats on her since the first blocking now and she's starting to shine. Only two more to go before the final blocking to remove any grain dips and level the surface and then two to three more spray coats.

Here's a couple showing the sides of the hull without flash.

Portside forward



Portside aft



Starboard forward



Starboard aft



Two photos of the same spot aft both with and without flash.



and



A little reflection test on the aft toe/transom rail.



These may be the least shots from this old building since we are moving to a newer, larger building this next week.
CharlieCobra is offline   Reply With Quote
Old 07-11-2010, 09:43   #2
Senior Cruiser

Cruisers Forum Supporter

Join Date: Oct 2008
Location: Coos Bay, Oregon
Boat: Valiant 40 (1975)
Posts: 4,073
Great Job Charles. Beth is coming back into the lot in two weeks....
s/v Beth is offline   Reply With Quote
Old 07-11-2010, 09:45   #3
Registered User
 
CharlieCobra's Avatar

Cruisers Forum Supporter

Join Date: Jun 2006
Location: PNW
Boat: Knutson K-35 Yawl "Oh Joy" - Mariner 31 Ketch "Kahagon" - K-40 "Seasmoke" - 30' Sloop "Baccus"
Posts: 1,289
What's she coming in for?
CharlieCobra is offline   Reply With Quote
Old 07-11-2010, 09:53   #4
Senior Cruiser

Cruisers Forum Supporter

Join Date: Oct 2008
Location: Coos Bay, Oregon
Boat: Valiant 40 (1975)
Posts: 4,073
New water tanks, hard dodger, radar with radar rack in the back, and the usual cleaning and spiffing for next season.
s/v Beth is offline   Reply With Quote
Old 07-11-2010, 10:49   #5
Registered User
 
delmarrey's Avatar

Join Date: Mar 2003
Location: Philippines in the winters
Boat: It’s in French Polynesia now
Posts: 11,368
Images: 122
A question for Charlie

What tooling do you use to do your scarfing. I have a 4" wide x 1" high x 30' water board I need to attach to my deck that will follow the contour of the hull. I'll be epoxy/glassing over it.
I've consider lap-staking but that's time consuming, especially out doors in this weather.

Beautiful job on the Lady J !!!

Thanks!
__________________
Faithful are the Wounds of a Friend, but the Kisses of the Enemy are Deceitful! ........
The measure of a man is how he navigates to a proper shore in the midst of a storm!
delmarrey is offline   Reply With Quote
Old 07-11-2010, 11:00   #6
Registered User
 
CharlieCobra's Avatar

Cruisers Forum Supporter

Join Date: Jun 2006
Location: PNW
Boat: Knutson K-35 Yawl "Oh Joy" - Mariner 31 Ketch "Kahagon" - K-40 "Seasmoke" - 30' Sloop "Baccus"
Posts: 1,289
I built a jig to carry the piece through a bandsaw and finish the joint with hand planers. Running a 50' piece through a bandsaw is a challenge. We specialize in this sort of woodwork and have slots available this Winter For your job I would recommend an 8:1 horizontal scarph joint with a lock in it, similar to what I've seen on Beth (Mark's boat).
CharlieCobra is offline   Reply With Quote
Old 07-11-2010, 11:54   #7
Registered User

Join Date: Aug 2007
Posts: 1,076
Outstanding work Charles!!! I wish I was there to assist as the skills learned, would be invaluable!! Keep us posted on the progress!! thanks
shadow is offline   Reply With Quote
Old 07-11-2010, 12:57   #8
Registered User
 
Blue Stocking's Avatar

Join Date: Dec 2008
Location: St. Georges, Bda
Boat: Rhodes Reliant 41ft
Posts: 4,131
Charlie,-looks great
What is the mast section shape. Solid, true hollow, or cheek pieces with fore and aft fillers.
__________________
so many projects--so little time !!
Blue Stocking is offline   Reply With Quote
Old 07-11-2010, 15:47   #9
Registered User
 
CharlieCobra's Avatar

Cruisers Forum Supporter

Join Date: Jun 2006
Location: PNW
Boat: Knutson K-35 Yawl "Oh Joy" - Mariner 31 Ketch "Kahagon" - K-40 "Seasmoke" - 30' Sloop "Baccus"
Posts: 1,289
True hollow box made from cheeks and fore and aft caps with fillers for the bottom eight feet.
CharlieCobra is offline   Reply With Quote
Old 07-11-2010, 18:06   #10
Registered User
 
delmarrey's Avatar

Join Date: Mar 2003
Location: Philippines in the winters
Boat: It’s in French Polynesia now
Posts: 11,368
Images: 122
8:1 aye!

Thanks Charlie!
__________________
Faithful are the Wounds of a Friend, but the Kisses of the Enemy are Deceitful! ........
The measure of a man is how he navigates to a proper shore in the midst of a storm!
delmarrey is offline   Reply With Quote
Old 07-11-2010, 19:09   #11
Registered User
 
CharlieCobra's Avatar

Cruisers Forum Supporter

Join Date: Jun 2006
Location: PNW
Boat: Knutson K-35 Yawl "Oh Joy" - Mariner 31 Ketch "Kahagon" - K-40 "Seasmoke" - 30' Sloop "Baccus"
Posts: 1,289
I used a 15:1 ON THESE MAST SECTIONS. I want NO possibility of joint failures.
CharlieCobra is offline   Reply With Quote
Reply

Tags
restoration


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
The Restoration of 'Lady J' - Week 10.5 - Almost Too Busy to Get Up Here . . . CharlieCobra Construction, Maintenance & Refit 6 09-10-2010 08:50
The Restoration of 'Lady J' - Week Nine - She's Taking on a New Look CharlieCobra Construction, Maintenance & Refit 5 24-09-2010 06:23
The Restoration of 'Lady J' - Week Seven - The Pace Quickens . . . CharlieCobra Construction, Maintenance & Refit 0 14-09-2010 18:23
The Restoration of 'Lady J' - Week Six - Seams, Seams and More Seams . . . CharlieCobra Construction, Maintenance & Refit 5 05-09-2010 09:38
The Restoration of 'Lady J' - Week Three - A Long One . . . CharlieCobra Construction, Maintenance & Refit 4 13-08-2010 18:52

Advertise Here


All times are GMT -7. The time now is 02:46.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.