Gezzerfying Decadence I
I'm starting to Gezzerfy Decadence I, while I continue my search for an assisted living marina.
My latest addition is a windlass and am looking for suggestions on how best to penetrate and seal the anchor locker to accommodate power & control wiring? My first thought was to us two(2) PVC LB's from the electrical trade and silicone both LB's or the ENT ends after install. I first trade is a Master Electrician, so that's my frame of reference. Any other ideas are more than welcome!!!
Thanks for any thoughts
Cheers
__________________
As I sit, a swirling sea of passion gives it's poems in waves underneath me.
The whispers of the sun in my eyes, a silence within.
Rhythm of the surf, drums of the sea. Thoughts tumble and toss about the deep blue abyss inside me, where the love of you dwells.
I'm fighting currents to get back to you, listening to the flow of your liquid language as you beckon me, "Come Play"
Mariners Cove, CI. Anonymous.
|