Cruisers Forum
 

Go Back   Cruisers & Sailing Forums > Scuttlebutt > The Sailor's Confessional
Cruiser Wiki Click Here to Login
Register Vendors FAQ Community Calendar Today's Posts Log in

Reply
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 01-09-2011, 19:59   #1
Registered User

Join Date: Sep 2011
Posts: 5
ICW Blue Heron Bridge Clearence Problem

The West Palm Beach ICW Blue Heron bridge is specified to provide 65 ft clearance at MHT. It is published on nautical charts and USCG bridge clearance documents to provide 65 ft clearance. 65 ft bridge clearance is the "standard" for fixed Atlantic intracoastal bridges. The bridge construction from the east side provides the 65 ft. The construction from the west side, the main channel provides only 63 ft. From mid tide to high tide, sailboats needing the 65 ft need to use the east opening.
tallsb is offline   Reply With Quote
Old 01-09-2011, 20:07   #2
Registered User

Join Date: Sep 2011
Posts: 5
Re: ICW Blue Heron Bridge Clearence Problem

view looking north, tall boats need to use the east opening
Attached Thumbnails
Click image for larger version

Name:	bridge approach.JPG
Views:	317
Size:	54.3 KB
ID:	31064  
tallsb is offline   Reply With Quote
Old 02-09-2011, 03:00   #3
Senior Cruiser
 
GordMay's Avatar

Cruisers Forum Supporter

Join Date: Mar 2003
Location: Thunder Bay, Ontario - 48-29N x 89-20W
Boat: (Cruiser Living On Dirt)
Posts: 49,439
Images: 241
Re: ICW Blue Heron Bridge Clearence Problem

Greetings and welcome aboard the CF tallsb.
__________________
Gord May
"If you didn't have the time or money to do it right in the first place, when will you get the time/$ to fix it?"



GordMay is online now   Reply With Quote
Reply

Tags
icw


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Gulf ICW Bridge Clearances F51 Navigation 6 11-07-2011 19:07

Advertise Here


All times are GMT -7. The time now is 01:30.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.